SAN CLAUDIO

The project consists of the volumetric and material definition for the new buildings to be realized in the Expansion of the Sewage Treatment Plant of San Claudio, near Oviedo.

10_05_02bis

10_05_03
04_TIRA

Being established the position and function of each element as well as the free heights required (according to hoists, bridge cranes, vertical pumps opening or access to machinery and spare parts), our objective is to provide the new buildings of volumes that respect the rural environment where they are located that meet the needs of use and heights demanded, using materials of low cost and simple maintenance.

Steel structure buildings support on large concrete tanks in situ through which the water circulates and is treated. There are two, Pretreatment and Reagents. These buildings of remarkable size are covered with embossed aluminum in order to dematerialize their volume and, thus, reducing their impact.

Three manholes are added as an access point to underground pipelines made in colored concrete to facilitate its identification.

05_TIRA
06_TIRA
07_TIRA
08_TIRA
09_TIRA
10_TIRA

The broken silhouette of the proposal is related to those of the nearby village houses and the change of material in the fronts reduces its scale. The plastered concrete block and the translucent polycarbonate allow its integration and natural lighting.

The square holes of uncertain size due to their lack of detail, confuse the spectator about the true size of the main building.

11_TIRA
12_TIRA
13_TIRA
14_TIRA
15_TIRA
16_TIRA
17_TIRA
18_TIRA
19_TIRA

The whole results in a cocktail of different buildings forced to understand each other in a green and privileged rural environment.

20a_TIRA

MONTEPORREIRO

10_03_01bis
10_03_02bis

Monteporreiro is a natural place next to the river Lérez, few kilometers from the city of Pontevedra. In this place, there is a catchment and pumping of water from the river for urban supply.

The increase in population to be supplied necessitates the expansion of capacity of the aforementioned collection and pumping station, maintaining its position along the river. The increase in capacity is achieved by means of new pumps whose height in both use (lowering) and maintenance (high) must be covered by the new building, which determines the minimum height of the same. This is the first condition of the project.

02_TIRA
03_TIRA
04_TIRA

The second condition is the need to ensure a minimum ventilation surface to the interior to ensure the salubrity of the jobs that are developed.

The third condition is that the construction has to be done with precast concrete up to 120cm high.

The project poses a simple solution to the three conditions: prefabricated units reach the minimum height necessary for the operation and maintenance of the pumps and are gradually separated from each other until the necessary ventilation surface is reached, as well as the “gravity” of the final volume. Two metal fronts, like gates, complete the needs of the program.

05_TIRA
06_TIRA
07_TIRA
08_TIRA

It is thus formalized as a large abstract element that is only related to the light metallic bridge in the vicinity; unique elements built in the leafy and thick vegetation on the banks of the river.

10_03_10bis
09_TIRA